Future Union
If you want to see what all of the building work is leading up to then you have come to the rigt place. From here you will be able to view artwork of the new Main Entrance, see videos of the 3D model and much more.
The Students’ Union is going to change substantially as a result of the building work. As well as altering the Main Entrance with the main contractors BAM the Students’ Union is also undertaking a series of other minor building works at this time to improve the whole building not just part of it.
The Students’ Union building has undergone huge changes since the first section was built in 1936. If you want to see how much the building has already changed since then please click here
If you want to see the building work as it happens check out our photo diary
If you have any questions about how the building will change or want to tell us what you think of it please post a comment or contact us.
3D Model
Here you can see videos of our new 3D model which was created by the ucampus team from the School of Architecture. This should allow you to more easily see the huge changes the building work will bring to the Students’ Union.
Image Gallery
Every few weeks we will be showing you a series of images of the changes which will be taking place to different spaces in the Students’ Union. Next up is the Source where you will be able to see its new layout and how it is more open and accessible.

Cut away views
Pull away the roof and various levels to have a look at what the building will look like on the inside.
Artwork
Here you can see some artwork of what the new Main Entrance and some of the interior, will look like when the building work is finished.
Floor plans (coming soon)
Here you can see floor plans of the Students’ Union with comparisons showing you the current layout and the new layout.
Elevations drawings
See how the building will change from the North and the South sides








